Cont./
Located within the River Avon flood plain the project carefully considered the street scene whllst postively addressing the River Avon. Buildings were arranged around a central street with cars located beneath using an innovative palletised parking system. The contemporary approach included crisp white render, panelised timber cladding and a wrap around zinc wall and roof to the office.
The application was refused at appeal for being 5 storeys, a building height that would later be considered acceptable!
The site was subsequently developed as student housing.